Building 5, Tian'An Park, No.36 Yongfeng Road, Qinghuai, Nanjing City, China
OHE20 stainless-steel hard-shell sitting chamber in a residential room

Chamber Room Planning & Installation

Get the room, the access route and the power right before the chamber ships. Most installation problems are decided months earlier, when someone picks a model without measuring the door. This is th

OHC20 cubic chamber seen from the door side in a clinic room

Solution

Chamber Room Planning & Installation

Get the room, the access route and the power right before the chamber ships

In short

What This Covers

Most installation problems are decided months earlier, when someone picks a model without measuring the door. This is the sequence Oxygen Times works through with buyers before a unit goes into production.

A chamber that cannot get into the room is a total loss, not a delay. Chamber bodies in this range run from a 45 kg soft-shell envelope to a 380 kg OHS Series 2-person shell, and the modular OHD15 exists precisely because some rooms can only take sections.

The process

Every Stage From Enquiry To Support

Measure the room

Clear floor area, ceiling height and where the gas unit will stand.

Measure the route

Door widths, corridor turns, lift car dimensions and stair landings.

Check the floor

Chamber weights range from approximately 45 kg to approximately 380 kg before the gas unit.

Confirm the power

Voltage, plug standard and circuit capacity for the destination market.

Choose the format

Soft shell if the route is tight or the room changes use; rigid if the room is dedicated.

Plan the clearance

Allow access on the entry side and space to service the gas unit.

Delivery and placement

Separable construction and wheels on the OHS Series; modular assembly on the OHD15.

Commissioning

Remote installation guidance and operational training over WhatsApp or video call.

What is available

Options On The Table

  • Footprint and access review before order
  • Modular assembly where the access route is restricted
  • Secondary air compressor as an optional upgrade
  • Protective outer cover for soft-shell chambers
  • Water chiller air conditioning for warm climates
  • Interior configuration and seating layout

Models

Chamber Room Planning & Installation Questions

What clearance should I allow around a chamber?
Plan for access on the entry side and working space around the gas unit. Take the footprint from the product page - the specification tables give the exact external dimensions for each model.
What if the chamber will not fit through the door?
That is what the OHD15 modular construction is for: CNC-machined aluminium sections assembled on site. Soft-shell chambers are the other answer, since they arrive folded.
Do you send an engineer to install it?
Support is remote - installation guidance and operational training by video and WhatsApp. On-site attendance is not part of the standard supply.
What happens in a hot climate?
An optional water chiller air conditioning system is available for the soft-shell chambers, and the OHE20 has integrated heating and cooling air conditioning built in.

Related Guides

ATA Pressure Explained For Hyperbaric Chamber Buyers

What 1.3, 1.5, 1.9 and 2.0 ATA mean in practice, and how to pick the pressure band before you shortlist a chamber.

Chamber Room Checklist Before You Place The Order

Door widths, lift dimensions, floor loading and power - the checks that decide whether a chamber can be installed at all.

How To Size A Hyperbaric Chamber For Your Users

Diameter, length and entry height decide who actually fits. A dimension-by-dimension guide across all seventeen models.

Talk to the factory

Talk To Us About Chamber Room Planning & Installation

Send your market, target models and volume expectation. We will come back with pricing, timelines and what the factory needs from you.

Most enquiries answered within 12 hours · OEM and wholesale welcome

Tell Us What You Need

Send your specification, quantity and destination port. Our engineers reply with a technical proposal and a confirmed lead time.